*Upload SRO name and membership number as per, circular no.26, dated 01.11.2019.
i) Copy of Layout Approval (in case of layout)-As per circular no. 20 dated 15/11/2018
Non Legible Plans are uploaded.Upload Legible sanctioned layout plan of all/
typical floors showing Area Pro-forma with sign and seal of competent
Authority.
Upload NA order being plotted development.
Mark/ border line of the building on layout plan proposed for registration.
Unsanctioned/ unsigned plans are uploaded, Upload Legible sanctioned
layout plan of all/ typical floors showing Area Pro-forma with sign and seal
of competent Authority.
ii) Building Plan Approval / NA Order for plotted development
Non Legible Plans are uploaded.Upload Legible sanctioned layout plan,
building plan of all/ typical floors showing Area Pro-forma with sign and seal
of competent Authority.
Highlighting the Total Plot/Project Area, Permissible Built-up Area, Parking,
identification of building as per sanctioned plan.
Unsanctioned/ unsigned plans are uploaded, Upload Legible sanctioned
building plan of all typical floors showing Area Pro-forma with sign and seal of
competent Authority.
iii) Commencement Certificate/NA order for plotted development
Upload the legible all complete documents of Commencement certificate issued by
competent authority.
Upload Revalidated CC / plinth completion / (As it is more than one-year-old and
work is not started).
If CC is not in the name of promoter, kindly add revised CC, in the name of
promoter / Development Agreement & POA with Landowner.
iv) Declaration about Commencement Certificate
Upload status of plan and CC of buildings as per sanctioned layout/ plan / CC in
tabular form.
Upload Declaration about CC in Format-D on promoter letter head with sign and
stamp image, as per circular No.32 dated,07/06/2021
v) Declaration in FORM B
Upload Notarized Affidavit cum declaration on Rs. 100 stamp paper in Form B Sr.
No. 3 mentioning date of completion (DD/MM/YYYY as mentioned in project and
building details) as per RERA format only. Don’t add or reduce any points.
*NOTE- Above data should be tally with sanctioned plan / other documents
uploaded
Project Name (Mention as per Sanctioned Plan)
Proposed Date of Completion
Plot Bearing No / CTS no / Survey Number/Final Plot no.
Village
Taluka
District
Pin Code
Total Area of Plot/Project
No. of Bldgs.( In the layout/plot)
No. of Sanctioned Building applied for this Registration
Total Recreational Open Space
Total Plot/Project area mismatch with sanctioned plans kindly mention as
per sanctioned plan and highlight on the plan.
In project details Plot No / CTS no / Survey Number/Final Plot no.
mismatch with CC, mention as per CC
In project details- Is project plan sanctioned by MCGM is selected as -No,
kindly correct the application
i) Sanctioned FSI of the project applied for registration:-
Sanctioned FSI of the Project applied for Registration (Sanctioned Built-up Area in sq.mt.)
Mismatch with Sanctioned plans kindly mention as per sanctioned plan and highlight on the plan.
ii) Permissible Total FSI of Project/Plot:-
Zero FSI CC is issued- Kindly correct building details table viz- No. of floors, stilt, parking,
carpet area, number of apartments as per zero FSI CC.
Project Name
Identification of building/wing/other as per approved plan
Proposed Date of Completion
No. of Basement/Plinth/Podiums/Sanctioned Floors/Stilts
Total No. of Parking
In building details, identification of building/wing as per sanctioned plan
Upload Parking details as per sanctioned plan in building detail field /project detail
fields.
Mention Individual unit carpet area as per approved plan. e.g. 1BHK-20sq.m-
30units
i) Common areas And Facilities, Amenities
ii) Project Professional Information
Information of all Project professionals as per circular no.21 dated 26/11/2018
Architect’s Certificate of Percentage of Completion of Work (Form 1)
(Architect’s Form -1, on respective letterhead, if required)
Engineers Certificate on Cost Incurred on Project (Form2)
(Engineer’s Form 2 on respective letterhead, if required)
For ongoing work upload engineers certificate form 2A. (as per GOM notification 22/12/2021)
Plan and CC not in the name of owner/promoter. If, Promoter is not landowner, add Promoter (all) landowner/ Investor, Field along with details of Landowners, form B, Regd. Development Agreement/ P.O.A/ MOU/ Sale deed and declaration about ownership etc.